My laptop has arrived today, two days after being dispatched and one day earlier than pcspecialist would suggest online. Pretty cool! Below, there should be links to pictures of both the front and back, neat cable mgmt. All works as expected and I'm a happy camper. Wouldn't let me upload the pictures, as too large.

Front and back
 

Babychino yolk

Bronze Level Poster
Yess dpd also says it's coming tomorrow.

Mustafa called me at 4:30pm to tell me that they forgot to add the extra 16gigs of ram because it was a separate order, he said that i can either let them install that and miss my delivery dispatch, and im like Noononono just send it separately ill add those its all good loooool im so buzzing right now.

I actually dont mind that, i had to open the case to install the 120mm fan anyway and adding rams im pretty sure i can manage that 🤣🤣

I hope there won't be any issues with the extra rams, ill have 4x in total 😬

Processed Date 08-08-2020
Pre-Production Date 14-08-2020
Build Date 26-08-2020
Test Date 27-08-2020
Awaiting Dispatch Date 28-08-2020
Dispatch Date 28-08-2020
 
Last edited:

SpyderTracks

We love you Ukraine
Yess dpd also says it's coming tomorrow.

Mustafa called me at 4:30pm to tell me that they forgot to add the extra 16gigs of ram because it was a separate order, he said that i can either let them install that and miss my delivery dispatch, and im like Noononono just send it separately ill add those its all good loooool im so buzzing right now.

I actually dont mind that, i had to open the case to install the 120mm fan anyway and adding rams im pretty sure i can manage that 🤣🤣

I hope there won't be any issues with the extra rams, ill have 4x in total 😬

Processed Date 08-08-2020
Pre-Production Date 14-08-2020
Build Date 26-08-2020
Test Date 27-08-2020
Awaiting Dispatch Date 28-08-2020
Dispatch Date 28-08-2020
Ah, yeah, much more important to get it shipped! It will run fine initially with 16Gb, and it's simple to add the rest. They should be able to ship the extra RAM next day shipping so worst comes to the worst I would expect you'll get it monday or tuesday.

So have you applied for saturday delivery with DPD?
 

Babychino yolk

Bronze Level Poster
Ah, yeah, much more important to get it shipped! It will run fine initially with 16Gb, and it's simple to add the rest. They should be able to ship the extra RAM next day shipping so worst comes to the worst I would expect you'll get it monday or tuesday.

So have you applied for saturday delivery with DPD?

Yeah and I'm so glad they can deliver it saturday, they said it'll be with me by 12pm tomorrow. Can't wait!
 

FerrariVie

Super Star
Too bad it was not dispatched on Friday (as it would be arriving today or tomorrow), but it will now probably arrive on Wednesday. Still, it's been a total of 10 running days since the order was made, which is a lot better than I expected. Today was supposed to be the build date based on the first estimate, but they're shipping it instead. 😊

Processed Date21-08-2020
Build Date27-08-2020
Test Date27-08-2020
Awaiting Dispatch Date31-08-2020
Dispatch Date31-08-2020
 
Last edited:

SlateGreyNevus

New member
I feel like I've been waiting for ages for mine. Hopefully it'll be dispatched today!


Processed Date
07-08-2020​
Pre-Production Date
14-08-2020​
Build Date
26-08-2020​
Test Date
26-08-2020​
 

FerrariVie

Super Star
Just to let you know that my Nova laptop did indeed arrive yesterday 🥳, so my total time was 12 running days or 8 working days, from order to delivery:

Processed Date21-08-2020
Build Date27-08-2020
Test Date27-08-2020
Awaiting Dispatch Date31-08-2020
Dispatch Date31-08-2020
Delivery Date02-09-2020
 

Frvr

Member
Thought I'd post as I had ordered not too long ago. For me, the production timeline has been pretty much exactly as they advertised with no delays. I ordered a desktop btw. My PC is currently with DPD but should arrive tomorrow or Friday. I used live chat to check up on the estimated build date on the 15th Sept; the rep did say that although my order still said that it was in pre-production, it had gone 'past the queue' and the parts were being gathered to be built. The live chat is a great service to give you peace of mind. Looking forward to my PC to be delivered; been anticipating it.


Processed Date04-09-2020
Pre-Production Date04-09-2020
Build Date15-09-2020
Test Date15-09-2020
Awaiting Dispatch Date15-09-2020
Dispatch Date16-09-2020
 