21How many days were you on?
Will doBeen waiting for that post for weeks! Pics when she comes.
👍👍👍👍Mine went into testing at about 14:00 today 😃
Going into build tomorrow!!! YEEEES
I spoke to the team at PCS due to me working in the industry full-time they've helped speed things up I reckon you'll go into build the same time as I willHow do you know this? Exciting news but I am ahead of you PP wise but not heard anything yet!
I spoke to the team at PCS due to me working in the industry full-time they've helped speed things up I reckon you'll go into build the same time as I will
We're in the next group of builds to be done! Should be printed at some point today/tomorrow with an expected delivery time of Friday/Monday!Oh great news! Fingers crossed, my excitement hit new levels! Let me know when yours does go into building.
Adding myself to the throng here! 22 days in pre-production and counting. The omens look positive for some good news this week!
Sure. Nothing particularly squirly here. Main difference from other posted specs being an AMD CPU
Case
CORSAIR 4000D AIRFLOW TEMPERED GLASS GAMING CASE
Processor (CPU)
AMD Ryzen 7 5800X Eight Core CPU (3.8GHz-4.7GHz/36MB CACHE/AM4)
Motherboard
ASUS® TUF X570-PLUS GAMING (USB 3.2 Gen 2, PCIe 4.0, CrossFireX) - ARGB Ready!
Memory (RAM)
16GB Corsair VENGEANCE DDR4 3600MHz (2 x 8GB)
Graphics Card
8GB NVIDIA GEFORCE RTX 3070 Ti - HDMI, DP
1st M.2 SSD Drive
500GB SAMSUNG 980 PRO M.2, PCIe NVMe (up to 6900MB/R, 5000MB/W)
Power Supply
CORSAIR 750W TXm SERIES™ SEMI-MODULAR 80 PLUS® GOLD, ULTRA QUIET
Power Cable
1 x 1 Metre UK Power Cable (Kettle Lead)
Processor Cooling
Corsair H115i RGB PRO XT Hydro Series High Performance CPU Cooler
Thermal Paste
STANDARD THERMAL PASTE FOR SUFFICIENT COOLING
Extra Case Fans
1x 120mm Thermaltake TOUGHFAN 12 Case Fan
Sound Card
ONBOARD 6 CHANNEL (5.1) HIGH DEF AUDIO (AS STANDARD)
Network Card
10/100/1000 GIGABIT LAN PORT
Wireless Network Card
WIRELESS INTEL® Wi-Fi 6 AX200 2,400Mbps/5GHz, 300Mbps/2.4GHz PCI-E CARD + BT 5.0
USB/Thunderbolt Options
MIN. 2 x USB 3.0 & 2 x USB 2.0 PORTS @ BACK PANEL + MIN. 2 FRONT PORTS
Operating System
Windows 10 Home 64 Bit - inc. Single Licence [KUK-00001]
Operating System Language
United Kingdom - English Language
Windows Recovery Media
Windows 10 Multi-Language Recovery Image - Unlimited Downloads from Online Account
Office Software
FREE 30 Day Trial of Microsoft 365® (Operating System Required)
Anti-Virus
NO ANTI-VIRUS SOFTWARE
Browser
Microsoft® Edge (Windows 10 Only)
Warranty
3 Year Standard Warranty (1 Month Collect & Return, 1 Year Parts, 3 Year Labour)
Delivery
STANDARD INSURED DELIVERY TO UK MAINLAND (MON-FRI)
Build Time
Standard Build - Approximately 12 to 15 working days
Promotional Item
Get Resident Evil Village with select Samsung SSDs
Welcome Book
PCSpecialist Welcome Book - United Kingdom & Republic of Ireland
Logo Branding
PCSpecialist Logo
Nope. Not switched anything apart from adding one fan on the day I placed the order. I suspect that PCS will cluster groups of similar builds together so that they can be built in parallel. A day or two here or there isn't a problem, it's just me being impatient!Interesting, seems odd that people with lower pre production times would be built before you then. Did you only just switch to the 3070ti or something?
Nope. Not switched anything apart from adding one fan on the day I placed the order. I suspect that PCS will cluster groups of similar builds together so that they can be built in parallel. A day or two here or there isn't a problem, it's just me being impatient!
Yes there is! Into building today (after 23 days pre-production).Yeah that's a fair point, hopefully be some good news in the next few days!
That's painful mate! I've been told my order will go into build this week Thankfully I work from home so I can set it up as I'm workingMine has been delivered.. But now I have to wait 5hrs til I finish work to get home and unbox... Life is soooo cruel lol 🤣🤣