Ordered pc at last

george682

Bronze Level Poster
Thanks to everyone on the "Check this spec" forum for their help and advice:clap:

Ordered two days ago.


Case
COOLERMASTER CM690 MKII ADVANCED CASE
Processor (CPU)
Intel® Core™i7 Quad Core Processor i7-3770 (3.4GHz) 8MB Cache
Motherboard
ASUS® P8Z77-V: PCI-E 3.0 READY, WIFI, SLI, CROSSFIREX
Memory (RAM)
16GB KINGSTON HYPER-X GENESIS DUAL-DDR3 1600MHz, X.M.P (4 x 4GB KIT)
Graphics Card
2GB NVIDIA GEFORCE GTX 670 - 2 DVI, HDMI, DP - 3D Vision Ready
Memory - 1st Hard Disk
120GB INTEL® 330 SERIES SSD, SATA 6 Gb/s (upto 500MB/sR | 450MB/sW)
2nd Hard Disk
1TB WD CAVIAR BLACK WD1002FAEX, SATA 6 Gb/s, 64MB CACHE (7200rpm)
1st DVD/BLU-RAY Drive
24x DUAL LAYER DVD WRITER ±R/±RW/RAM
Memory Card Reader
INTERNAL 52 IN 1 CARD READER (XD, MS, CF, SD, etc) + 1 x USB 2.0 PORT
Power Supply
CORSAIR 750W PRO SERIES™ HX750-80 PLUS® GOLD MODULAR (£119)
Processor Cooling
Super Quiet 22dBA Triple Copper Heatpipe Intel CPU Cooler (£19)
Sound Card
ONBOARD 6 CHANNEL (5.1) HIGH DEF AUDIO (AS STANDARD)
Network Facilities
10/100/1000 GIGABIT LAN PORT - AS STANDARD ON ALL PCs
USB Options
2 PORT USB 3.0 INTERNAL PCI-EX CARD + STANDARD USB PORTS
Operating System
Genuine Windows 7 Home Premium 64 Bit w/SP1 - inc DVD & Licence (£79)
Office Software
NO OFFICE SOFTWARE
Anti-Virus
BULLGUARD INTERNET SECURITY - FREE 90 DAY TRIAL
Warranty
3 Year Silver Warranty (1 Year Collect & Return, 1 Year Parts, 3 Year Labour) (£5)
Delivery
SCOTTISH HIGHLANDS & UK OFFSHORE ISLANDS / N IRELAND (£12)
Build Time
Standard Build - Approximately 8 to 10 working days
Quantity
1

Price: £1,277.00 including VAT and delivery.
 
Last edited:

Chriso

Gold Level Poster
Mines in Production aswell on the 3rd working day at he moment. Dunno if they have started building or not lol.
 

Chriso

Gold Level Poster
The youtube reviews I watched people said there builds come between 2-3 weeks so lets see who gets there's first :p production time started on monday for me on 3rd working day atm :).

Indeed your rigs a beast lol :) enjoy when you get it :p.
 
Last edited:

george682

Bronze Level Poster
The youtube reviews I watched people said there builds come between 2-3 weeks so lets see who gets there's first :p production time started on monday for me on 3rd working day atm :).

Indeed your rigs a beast lol :) enjoy when you get it :p.

My rig is "In Building" today the 7th working day:clap:
 

Chriso

Gold Level Poster
I just got an email saying my PC has been built and going through testing and configuration now :D /excited. But not so excited about the dam snow lol:eek:

Started building on 6th working day :p
 

george682

Bronze Level Poster
I just got an email saying my PC has been built and going through testing and configuration now :D /excited. But not so excited about the dam snow lol:eek:

Started building on 6th working day :p

No snow here:tt2:

I think your gonna get your rig before me :sweatdrop:
 

Niem

Enthusiast
I just got an email saying my PC has been built and going through testing and configuration now :D /excited. But not so excited about the dam snow lol:eek:

Started building on 6th working day :p

Just ordered my PC, it's pretty much the same as yours except I've chose the i5-3570, also amended my order and added a SSD, Couldn't resist!
It's been snowing heavily here all day:no:
 

Scotch

Gold Level Poster
Just ordered my PC, it's pretty much the same as yours except I've chose the i5-3570, also amended my order and added a SSD, Couldn't resist!
It's been snowing heavily here all day:no:


I haven't had any snow just rain, I live in scotland soo yeah no change here. I realised you all have bought pc's and i got a laptop so i'll likely now not get mine for another 2 weeks :*(
 

Chriso

Gold Level Poster
Just ordered my PC, it's pretty much the same as yours except I've chose the i5-3570, also amended my order and added a SSD, Couldn't resist!
It's been snowing heavily here all day:no:

I went for the i5 3570 aswell :) I changed my PSU from a bronze to a modular psu :D.
Scotch I think laptops have a shorter wait time then desktops but if you check there is a list of build timings
 
Last edited:

george682

Bronze Level Poster
Just got this e-mail from pcs "Your order has now been built and is awaiting testing and configuration" :clap:
 

george682

Bronze Level Poster
"In Quality Control" on the 9th day. :cool2: :clap:

Now,- - - - - - I wonder,- - - - - - what comes after Quality Control ? ? ? ? :2guns: :2guns:
 
Top