Hi all. I got my first PC from PCspecialsit as per details:
Production Dates
Processed Date 19-06-2010 (Saturday)
Pre-Production Date 22-06-2010 (Tuesday)
Build Date 28-06-2010 (Monday)
Test Date 30-06-2010 (Wednesday)
QC Date 05-07-2010 (Monday)
Awaiting Dispatch Date 05-07-2010
Dispatch Date 05-07-2010
That's 11 working days for my PC to be built and sent to me which is exactly what they said " Build Time: Between 9-11 Working Days"!!
I didn't choose the faster build times because I was in no rush.
Everything great since then.
Now I have paid for a Laptop and chose the "Build Time-Standard Build - Approximately 7 to 9 working days"
Production Dates
Processed Date 31-08-2012 (Friday)
Pre-Production Date 04-09-2012 (Tuesday)
Today is the 7th Working Day. They have 2 more days to Build it, Test it, Quality Control it and Dispatch it! This better not be rushed... because I won't be happy with poor;y assembled equipment.
My question is "Has this happened to anyone else?" "Is it normal?" I mean going on from my first PC...this looks like they forgot about my laptop altogether.
I read somewhere Pre-Production can take like 30 days or something? Well why would that be? I mean If I chose the Fast 3 day build surely they would have gotten it ready in those 3 days, so why take so long on a Standard Build Time? 30 days? seriously? that's not how a company survives surely?
------------------------------------------------------------------------------------------------------------------------------
EDIT 1:
Update: 14-09-12
Proccessed Date: 31-08-2012
Pre-Production Date: 04-09-2012
Build Date: 13-09-2012
Test Date: 14-09-2012 (12:41)
Awaiting Dispatch: 14-09-2012 (12:52) --- (11 minutes testing??)
Build, Test and awaiting Dispatch in 1 day. Completely missed the Quality Control stage.
Told you it will get rushed but nobody believed me.
Where as my first PC they made in 2010 had the full works.
------------------------------------------------------------------------------------------------------------------------------
EDIT 2:
Update: 19-09-12
I have an update for you guys!
Laptop arrived. /cheer
Installed OS /cheer
Installed Drivers /Cheer
Installed Guild Wars 2 /Cheer
Ran Guild Wars 2 . . . . . .. . . . . . . . . . . . .5 FPS MAX.
I thought.... no way!?!?!
Did my own tests, nothing changed. Forced to call PCS. Spoke to tech person and he even took control of my laptop and said that the NVIDIA graphics card is there, being recognized but for some reason the built in graphics chip is taking priority over the Nvidia 660M and not running it.
SO more tests the next day (today) with re installing windows and using only the drivers PCS sent me (no updating graphic drivers) it still gave me MAX 5 FPS.
So the tech guy said to do an RMA and hopefully someone is gonna pick it up tomorrow... I sold my old laptop cause I knew I would get this in hope to play Guild Wars 2 and now I wlll be laptop less again for possibly 2 weeks while my friends play and I stare at the Guild Wars 2 Box.
I told you all that it was rushed but you didn't want to believe it. I didn't want to believe it. I guess they just wanted to process more builds that day
Hopefully when I get it back I don't get another dis functional laptop or I will be asking for a refund.
Thanks
------------------------------------------------------------------------------------------------------------------------------
EDIT 3:
UPDATE: 29/09/2012
Laptop arrived Friday 28th after getting repaired.
Came back in a much smaller box than the original i sent back.
Ok turned it on, installed everything and prayed the game plays properly and it did.
Hooray!
So end of the day I turn off the laptop and go to bed.
This morning I turned it on and straight away noticed the screen was flickering horribly, ON and OFF. I was like WTF!?!?!
This can't be real. So i let it load and I am on my desktop with the flickering still happening.
So I reset and hope it was a minor glitch.
Guess what.. it wasn't....
So i recorded it for evidence. The battery was full as well.
So just as I was about to turn it off my brother suggested to plug in the charger.
And amazingly that stopped the flickering. But as soon as you remove it, the flickering starts up again.
Seriously... what?!?!?!
PCspecialist first sends me a laptop with a broken graphics card, then repairs it and sends it back with what I am guessing is a faulty battery....
It's not acceptable that the screen should flicker that horribly like that when not connected to the charger.
I will be asking for a refund this Monday as they are not at work on weekends i believe.
Searching online, it would seem that it may be a faulty Screen and not Faulty Battery... either way.. I am asking for a refund.
------------------------------------------------------------------------------------------------------------------------------
EDIT 4:
UPDATE: 27/05/2013
Ok guy, didn't update anyone of the end result so I will do that now.
I was fuming on the phone saying everything I wanted and wasn't holding back.
How the company has gone the opposite direction from what I knew back in 2010 when I first got my PC from them (which is still glitch free)
I told the guy I did not believe they carried out the tests they claimed to do on the laptop otherwise I wouldn't have had to send it in so many times.
The guy was understanding and I told him that my work has been piling up since i have had to send it back so many times. I he said something that I was not expecting.
"Ok mate, I tell you what. We are going to make you another laptop from scratch and send that over to you by tomorrow. This is only being done because of how serious the situation has gotten, We wouldn't do this normally."
I was gob smacked!
He said he is going to get on it himself and make it himself and have it done today so it I can receive it the following day.
Now this can be thought of 2 ways.
1) You would think wow, PCS is so awesome they doing this, we can forget about all those repairs then.
2) What I have been thinking all this time was true. If this guy can build and "test" my new laptop to be fully functional in less than a day and get it delivered next day then it clearly shows that previous laptop had received next to nothing attention each time it was sent to repair. Took a week each time for the first laptop to be repaired only to return with another problem. So not much care was shown on that laptop. I am forced to use Balance of probabilities and say that I stand with my thoughts. I'm sorry if you feel different about PCS. Also I have been reading recent posts about people saying that they have much more orders than before and but not enough staff to meet it properly.
Well Anyway the new laptop did come; they took the old one and all is good. but just a while ago it started to make a horrible sound.
Long Story short, they sent a replacement fan and I had to replace it myself and its been fine ever since.
Now I am looking to get a new PC for myself (laptop was for my brother) and having doubts about PCS.
Production Dates
Processed Date 19-06-2010 (Saturday)
Pre-Production Date 22-06-2010 (Tuesday)
Build Date 28-06-2010 (Monday)
Test Date 30-06-2010 (Wednesday)
QC Date 05-07-2010 (Monday)
Awaiting Dispatch Date 05-07-2010
Dispatch Date 05-07-2010
That's 11 working days for my PC to be built and sent to me which is exactly what they said " Build Time: Between 9-11 Working Days"!!
I didn't choose the faster build times because I was in no rush.
Everything great since then.
Now I have paid for a Laptop and chose the "Build Time-Standard Build - Approximately 7 to 9 working days"
Production Dates
Processed Date 31-08-2012 (Friday)
Pre-Production Date 04-09-2012 (Tuesday)
Today is the 7th Working Day. They have 2 more days to Build it, Test it, Quality Control it and Dispatch it! This better not be rushed... because I won't be happy with poor;y assembled equipment.
My question is "Has this happened to anyone else?" "Is it normal?" I mean going on from my first PC...this looks like they forgot about my laptop altogether.
I read somewhere Pre-Production can take like 30 days or something? Well why would that be? I mean If I chose the Fast 3 day build surely they would have gotten it ready in those 3 days, so why take so long on a Standard Build Time? 30 days? seriously? that's not how a company survives surely?
------------------------------------------------------------------------------------------------------------------------------
EDIT 1:
Update: 14-09-12
Proccessed Date: 31-08-2012
Pre-Production Date: 04-09-2012
Build Date: 13-09-2012
Test Date: 14-09-2012 (12:41)
Awaiting Dispatch: 14-09-2012 (12:52) --- (11 minutes testing??)
Build, Test and awaiting Dispatch in 1 day. Completely missed the Quality Control stage.
Told you it will get rushed but nobody believed me.
Where as my first PC they made in 2010 had the full works.
------------------------------------------------------------------------------------------------------------------------------
EDIT 2:
Update: 19-09-12
I have an update for you guys!
Laptop arrived. /cheer
Installed OS /cheer
Installed Drivers /Cheer
Installed Guild Wars 2 /Cheer
Ran Guild Wars 2 . . . . . .. . . . . . . . . . . . .5 FPS MAX.
I thought.... no way!?!?!
Did my own tests, nothing changed. Forced to call PCS. Spoke to tech person and he even took control of my laptop and said that the NVIDIA graphics card is there, being recognized but for some reason the built in graphics chip is taking priority over the Nvidia 660M and not running it.
SO more tests the next day (today) with re installing windows and using only the drivers PCS sent me (no updating graphic drivers) it still gave me MAX 5 FPS.
So the tech guy said to do an RMA and hopefully someone is gonna pick it up tomorrow... I sold my old laptop cause I knew I would get this in hope to play Guild Wars 2 and now I wlll be laptop less again for possibly 2 weeks while my friends play and I stare at the Guild Wars 2 Box.
I told you all that it was rushed but you didn't want to believe it. I didn't want to believe it. I guess they just wanted to process more builds that day
Hopefully when I get it back I don't get another dis functional laptop or I will be asking for a refund.
Thanks
------------------------------------------------------------------------------------------------------------------------------
EDIT 3:
UPDATE: 29/09/2012
Laptop arrived Friday 28th after getting repaired.
Came back in a much smaller box than the original i sent back.
Ok turned it on, installed everything and prayed the game plays properly and it did.
Hooray!
So end of the day I turn off the laptop and go to bed.
This morning I turned it on and straight away noticed the screen was flickering horribly, ON and OFF. I was like WTF!?!?!
This can't be real. So i let it load and I am on my desktop with the flickering still happening.
So I reset and hope it was a minor glitch.
Guess what.. it wasn't....
So i recorded it for evidence. The battery was full as well.
So just as I was about to turn it off my brother suggested to plug in the charger.
And amazingly that stopped the flickering. But as soon as you remove it, the flickering starts up again.
Seriously... what?!?!?!
PCspecialist first sends me a laptop with a broken graphics card, then repairs it and sends it back with what I am guessing is a faulty battery....
It's not acceptable that the screen should flicker that horribly like that when not connected to the charger.
I will be asking for a refund this Monday as they are not at work on weekends i believe.
Searching online, it would seem that it may be a faulty Screen and not Faulty Battery... either way.. I am asking for a refund.
------------------------------------------------------------------------------------------------------------------------------
EDIT 4:
UPDATE: 27/05/2013
Ok guy, didn't update anyone of the end result so I will do that now.
I was fuming on the phone saying everything I wanted and wasn't holding back.
How the company has gone the opposite direction from what I knew back in 2010 when I first got my PC from them (which is still glitch free)
I told the guy I did not believe they carried out the tests they claimed to do on the laptop otherwise I wouldn't have had to send it in so many times.
The guy was understanding and I told him that my work has been piling up since i have had to send it back so many times. I he said something that I was not expecting.
"Ok mate, I tell you what. We are going to make you another laptop from scratch and send that over to you by tomorrow. This is only being done because of how serious the situation has gotten, We wouldn't do this normally."
I was gob smacked!
He said he is going to get on it himself and make it himself and have it done today so it I can receive it the following day.
Now this can be thought of 2 ways.
1) You would think wow, PCS is so awesome they doing this, we can forget about all those repairs then.
2) What I have been thinking all this time was true. If this guy can build and "test" my new laptop to be fully functional in less than a day and get it delivered next day then it clearly shows that previous laptop had received next to nothing attention each time it was sent to repair. Took a week each time for the first laptop to be repaired only to return with another problem. So not much care was shown on that laptop. I am forced to use Balance of probabilities and say that I stand with my thoughts. I'm sorry if you feel different about PCS. Also I have been reading recent posts about people saying that they have much more orders than before and but not enough staff to meet it properly.
Well Anyway the new laptop did come; they took the old one and all is good. but just a while ago it started to make a horrible sound.
Long Story short, they sent a replacement fan and I had to replace it myself and its been fine ever since.
Now I am looking to get a new PC for myself (laptop was for my brother) and having doubts about PCS.
Last edited: