Hey guys!
So here we go again
I would like to have that i7-2700k processor apart from the fact that I will not notice big difference in high-end gaming.
My only question is that how reliable, well built and perform this monitor that I have selected?
I would appreciate if you could tell me anything about it.
So here is the spec:
Case
COOLERMASTER HAF-X FULL TOWER GAMING CASE
Processor (CPU)
Intel® Core™i7-2700k Quad Core (3.50GHz, 8MB Cache) + HD Graphics
Motherboard
ASUS® P8Z68-V: USB 3.0, SATA 6GBs, NVIDIA®SLI™, ATI®CrossFireX
Memory (RAM)
8GB KINGSTON HYPER-X GENESIS DUAL-DDR3 1600MHz, X.M.P (2 x 4GB KIT)
Graphics Card
1.5GB NVIDIA GEFORCE GTX 580 - 2 DVI, HDMI, DP - 3D Vision Ready
Memory - 1st Hard Disk
1TB WD CAVIAR BLACK WD1002FAEX, SATA 6 Gb/s, 64MB CACHE (7200rpm)
1st DVD/BLU-RAY Drive
12x BLU-RAY ROM DRIVE, 16x DVD ±R/±RW (£45)
Power Supply
CORSAIR 1050W PRO SERIES™ HX1050-80 PLUS® SILVER MODULAR (£162)
Processor Cooling
SUPER QUIET 22dBA TRIPLE COPPER HEATPIPE INTEL CPU COOLER (£19)
Sound Card
ONBOARD 6 CHANNEL (5.1) HIGH DEF AUDIO (AS STANDARD)
Network Facilities
ONBOARD 10/100/1000 GIGABIT LAN PORT - AS STANDARD ON ALL PCs
USB Options
6 x USB 2.0 PORTS @ BACK PANEL (MIN 2 FRONT PORTS) AS STANDARD
Operating System
Genuine Windows 7 Home Premium 64 Bit - inc DVD & Licence (£79)
Office Software
Microsoft® Office Home & Student 2010 (1 License Product Key Card) (£82)
Anti-Virus
BULLGUARD INTERNET SECURITY - FREE 90 DAY TRIAL
Monitor
IIYAMA E2273HDS 22" LED WIDESCREEN, HDMI/DVI-D 1920x1080 (£139)
DVI-D & HDMI Monitor Cables
1 x 2 METRE GOLD PLATED V1.4 HDMI CABLE (£8)
Warranty
3 Year Silver Warranty (1 Year Collect & Return, 1 Year Parts, 3 Year Labour) (£5)
Delivery
PCS EXTRA-CARE DIAMOND DELIVERY - MON-FRI, PRE-NOON (£9)
Build Time
Standard Build - Approximately 10 to 12 working days
Miscellaneous
FREE Battlefield 3 with 2nd Generation Intel® Core™ Processor-K
Quantity
1
Price: £1,735.00 including VAT and delivery.
(Probably I wont get the free BF3 since I am going to order this spec in the beginning of next month . . . )
St3
So here we go again
I would like to have that i7-2700k processor apart from the fact that I will not notice big difference in high-end gaming.
My only question is that how reliable, well built and perform this monitor that I have selected?
I would appreciate if you could tell me anything about it.
So here is the spec:
Case
COOLERMASTER HAF-X FULL TOWER GAMING CASE
Processor (CPU)
Intel® Core™i7-2700k Quad Core (3.50GHz, 8MB Cache) + HD Graphics
Motherboard
ASUS® P8Z68-V: USB 3.0, SATA 6GBs, NVIDIA®SLI™, ATI®CrossFireX
Memory (RAM)
8GB KINGSTON HYPER-X GENESIS DUAL-DDR3 1600MHz, X.M.P (2 x 4GB KIT)
Graphics Card
1.5GB NVIDIA GEFORCE GTX 580 - 2 DVI, HDMI, DP - 3D Vision Ready
Memory - 1st Hard Disk
1TB WD CAVIAR BLACK WD1002FAEX, SATA 6 Gb/s, 64MB CACHE (7200rpm)
1st DVD/BLU-RAY Drive
12x BLU-RAY ROM DRIVE, 16x DVD ±R/±RW (£45)
Power Supply
CORSAIR 1050W PRO SERIES™ HX1050-80 PLUS® SILVER MODULAR (£162)
Processor Cooling
SUPER QUIET 22dBA TRIPLE COPPER HEATPIPE INTEL CPU COOLER (£19)
Sound Card
ONBOARD 6 CHANNEL (5.1) HIGH DEF AUDIO (AS STANDARD)
Network Facilities
ONBOARD 10/100/1000 GIGABIT LAN PORT - AS STANDARD ON ALL PCs
USB Options
6 x USB 2.0 PORTS @ BACK PANEL (MIN 2 FRONT PORTS) AS STANDARD
Operating System
Genuine Windows 7 Home Premium 64 Bit - inc DVD & Licence (£79)
Office Software
Microsoft® Office Home & Student 2010 (1 License Product Key Card) (£82)
Anti-Virus
BULLGUARD INTERNET SECURITY - FREE 90 DAY TRIAL
Monitor
IIYAMA E2273HDS 22" LED WIDESCREEN, HDMI/DVI-D 1920x1080 (£139)
DVI-D & HDMI Monitor Cables
1 x 2 METRE GOLD PLATED V1.4 HDMI CABLE (£8)
Warranty
3 Year Silver Warranty (1 Year Collect & Return, 1 Year Parts, 3 Year Labour) (£5)
Delivery
PCS EXTRA-CARE DIAMOND DELIVERY - MON-FRI, PRE-NOON (£9)
Build Time
Standard Build - Approximately 10 to 12 working days
Miscellaneous
FREE Battlefield 3 with 2nd Generation Intel® Core™ Processor-K
Quantity
1
Price: £1,735.00 including VAT and delivery.
(Probably I wont get the free BF3 since I am going to order this spec in the beginning of next month . . . )
St3