1pc

skril

Bronze Level Poster
CORSAIR iCUE 465X RGB GAMING CASE
Processor (CPU)
AMD Ryzen 5 5600X Six Core CPU (3.7GHz-4.6GHz/35MB CACHE/AM4)
Motherboard
ASUS® STRIX B550-F GAMING (DDR4, USB 3.2, 6Gb/s) - ARGB Ready!
Memory (RAM)
16GB Corsair VENGEANCE RGB PRO DDR4 3200MHz (2 x 8GB)
Graphics Card
8GB AMD RADEON™ RX 5700 XT - HDMI, DP - DX® 12
1st M.2 SSD Drive
1TB PCS PCIe M.2 SSD (2000 MB/R, 1100 MB/W)
Power Supply
CORSAIR 750W RMx SERIES™ MODULAR 80 PLUS® GOLD, ULTRA QUIET
Power Cable
1 x 1 Metre UK Power Cable (Kettle Lead)
Processor Cooling
Corsair H100i RGB PLATINUM Hydro Series High Performance CPU Cooler
Thermal Paste
STANDARD THERMAL PASTE FOR SUFFICIENT COOLING
Sound Card
ONBOARD 6 CHANNEL (5.1) HIGH DEF AUDIO (AS STANDARD)
Network Card
10/100/1000 GIGABIT LAN PORT (Wi-Fi NOT INCLUDED)
Wireless Network Card
WIRELESS INTEL® Wi-Fi 6 AX200 2,400Mbps/5GHz, 300Mbps/2.4GHz PCI-E CARD + BT 5.0
USB/Thunderbolt Options
MIN. 2 x USB 3.0 & 2 x USB 2.0 PORTS @ BACK PANEL + MIN. 2 FRONT PORTS
Operating System
NO OPERATING SYSTEM REQUIRED
Operating System Language
United Kingdom - English Language
Windows Recovery Media
NO RECOVERY MEDIA REQUIRED
Office Software
FREE 30 Day Trial of Microsoft 365® (Operating System Required)
Anti-Virus
NO ANTI-VIRUS SOFTWARE
Browser
Microsoft® Edge (Windows 10 Only)
Warranty
3 Year Silver Warranty (1 Year Collect & Return, 1 Year Parts, 3 Year Labour)
Delivery
STANDARD INSURED DELIVERY TO UK MAINLAND (MON-FRI)
Build Time
Standard Build - Approximately 13 to 15 working days
 

SpyderTracks

We love you Ukraine
Are you looking for advice?

If you can post what you're using it for?

What's your max budget?

What monitor are you pairing it with, what resolution and refresh rate or make and model if you're unsure?
 

skril

Bronze Level Poster
Everyday use, gaming, this is max budget, bit too much 1300-1400 pound max,(MEAN COMPUTER ONLY) i have.to buy monitor yet and pheriperials BUT this for extra cost
 

SpyderTracks

We love you Ukraine
Everyday use, gaming, this is max budget, bit too much 1300-1400 pound max,(MEAN COMPUTER ONLY) i have.to buy monitor yet and pheriperials BUT this for extra cost
What's your budget for the monitor as the monitor will determine the GPU?
 

SpyderTracks

We love you Ukraine
Max 300 think about yiama gmaster or aoc 1440p 144hz
The above looks good apart from the GPU, swap it out for the 3060ti when it's released in a couple of weeks, or the RX5800 on the 18th November.

You don't want the 5700XT, it's old now and totally redundant both in price and performance.

You can drop the cooler to the stock cooler to save some cash.
 

skril

Bronze Level Poster
Cant wait longer, i wanted 3070 or new radeon but rtx is imposible to buy for now, will be on market in january or february in my opinion. 5700xt was only one option for now. Im gonna change this card next year and.will sell this one.
 

skril

Bronze Level Poster
WILL leave cooler maybe will overclocking in future and looks cool for my daughter:D
 

SpyderTracks

We love you Ukraine
Cant wait longer, i wanted 3070 or new radeon but rtx is imposible to buy for now, will be on market in january or february in my opinion. 5700xt was only one option for now. Im gonna change this card next year and.will sell this one.
As said, the new AMD cards are released on 18th.

It won't be built by then even if you configure a Rx5700XT, will take at least a month, it's really busy at the moment.
 

skril

Bronze Level Poster
I have to fast fingers at moment, finance is approved and my order in procesing, dont know if i can change this yet
And no info on pcs about new cards and prices yet
 

SpyderTracks

We love you Ukraine
I have to fast fingers at moment, finance is approved and my order in procesing, dont know if i can change this yet
And no info on pcs about new cards and prices yet
PCS release cards on release day, it's not set by them but by AMD, and the release date is the 18th of this month. They'll be in stock on release day as always.
 

skril

Bronze Level Poster
Anyway will leave this card for now, no idea if i can.do any changes after processing, second think is nobody know what will be with availability and prices after 18th. Cpu cost more what.i think.before. i hope psu is enough for 3070 or 6800xt what i gonna buy next year when will be.possible to buy
 

SpyderTracks

We love you Ukraine
Anyway will leave this card for now, no idea if i can.do any changes after processing, second think is nobody know what will be with availability and prices after 18th. Cpu cost more what.i think.before. i hope psu is enough for 3070 or 6800xt what i gonna buy next year when will be.possible to buy
You can change components up until it's in the building stage.

We know the prices already.

PSU is fine for either of those cards.
 

skril

Bronze Level Poster
4 days still procesing? Is it normal?
Only one email from them , don't know what mean for me


Just a quick update to keep you informed on the build status of your order. We aim to send you this update email every 5 days until your order is assembled so that you can keep track on the progress.

We have a finite number of staff and a varying orderbook and this means that lead times change daily depending on the number of orders we are processing. We can calculate an estimated build date based on the number of orders placed before you and the number of orders we are assembling per day. This date is not a guaranteed assembly date, nor is it a promise that your order will be assembled on or around this date, it is simply our best estimate of when we will assemble your order.

The current estimated build date for your order is: Thursday 3 December 2020.

We will send you another email with an updated build schedule in 5 days time, or if we discover any foreseen delays we will call you.

Kind Regards

PC Specialist Ltd
Customer Service
 

SpyderTracks

We love you Ukraine
4 days still procesing? Is it normal?
Only one email from them , don't know what mean for me


Just a quick update to keep you informed on the build status of your order. We aim to send you this update email every 5 days until your order is assembled so that you can keep track on the progress.

We have a finite number of staff and a varying orderbook and this means that lead times change daily depending on the number of orders we are processing. We can calculate an estimated build date based on the number of orders placed before you and the number of orders we are assembling per day. This date is not a guaranteed assembly date, nor is it a promise that your order will be assembled on or around this date, it is simply our best estimate of when we will assemble your order.

The current estimated build date for your order is: Thursday 3 December 2020.

We will send you another email with an updated build schedule in 5 days time, or if we discover any foreseen delays we will call you.

Kind Regards

PC Specialist Ltd
Customer Service
How did you pay?
 

Amin

Member
4 days still procesing? Is it normal?
Only one email from them , don't know what mean for me


Just a quick update to keep you informed on the build status of your order. We aim to send you this update email every 5 days until your order is assembled so that you can keep track on the progress.

We have a finite number of staff and a varying orderbook and this means that lead times change daily depending on the number of orders we are processing. We can calculate an estimated build date based on the number of orders placed before you and the number of orders we are assembling per day. This date is not a guaranteed assembly date, nor is it a promise that your order will be assembled on or around this date, it is simply our best estimate of when we will assemble your order.

The current estimated build date for your order is: Thursday 3 December 2020.

We will send you another email with an updated build schedule in 5 days time, or if we discover any foreseen delays we will call you.

Kind Regards

PC Specialist Ltd
Customer Service
It is normal because I paid mine through finance and it was in Processing for 5 working days, then on 6th working day it went into Pre-Production.
 
Top